If you do not know how to pass the exam more effectively, I'll give you a suggestion is to choose a good training site. This can play a multiplier effect. ITCertKing site has always been committed to provide candidates with a real Avaya 6102-1 certification exam training materials. The ITCertKing Avaya 6102-1 Certification Exam software are authorized products by vendors, it is wide coverage, and can save you a lot of time and effort.
When you're in pain, it is best to learn things. Learning will make you invincible. ITCertKing Avaya 6102-1 exam training materials can also help you to be invincible. With this training materials, you will receive the Avaya 6102-1 certification which recognized and accepted internationally. Then all of your life, including money and position, will improve a lot. Until then, will you still feel painful? No, you will be very happy. You should thanks ITCertKing which provide you with a good training materials. It can help you when you lost, and let you not only improve your own quality, but also demonstratethe value of your perfect life.
ITCertKing's Avaya 6102-1 exam training materials allows candidates to learn in the case of mock examinations. You can control the kinds of questions and some of the problems and the time of each test. In the site of ITCertKing, you can prepare for the exam without stress and anxiety. At the same time, you also can avoid some common mistakes. So you will gain confidence and be able to repeat your experience in the actual test to help you to pass the exam successfully.
Many ambitious IT professionals want to make further improvements in the IT industry and be closer from the IT peak. They would choose this difficult Avaya certification 6102-1 exam to get certification and gain recognition in IT area. Avaya 6102-1 is very difficult and passing rate is relatively low. But enrolling in the Avaya certification 6102-1 exam is a wise choice, because in today's competitive IT industry, we should constantly upgrade ourselves. However, you can choose many ways to help you pass the exam.
ITCertKing is a website which always provide you the latest and most accurate information about Avaya certification 6102-1 exam. In order to allow you to safely choose us, you can free download part of the exam practice questions and answers on ITCertKing website as a free try. ITCertKing can ensure you 100% pass Avaya certification 6102-1 exam.
Exam Code: 6102-1
Exam Name: Avaya (Avaya Virtual Services Platform 9000 Implementation Exam)
One year free update, No help, Full refund!
Total Q&A: 67 Questions and Answers
Last Update: 2013-12-17
6102-1 Free Demo Download: http://www.itcertking.com/6102-1_exam.html
NO.1 A campus network requirement is to introduce Virtual Routing and Forwarding (VRF) in
the existing
Virtual Services Platform (VSP) 9000 core. The technician needs to configure VRF on the
VSP 9000.
Which statement represents the proper order for configuring a new VRF?
A. Create a new VLAN, add an IP address, create a VRF, and move the VLAN to the new
VRF.
B. Create a VRF, add an IP address, create a new VLAN, and move the VLAN to the new
VRF.
C. Create a VRF, create a new VLAN, add an IP address, and move the VLAN to the new
VRF.
D. Create VRF, create a new VLAN, move the VLAN to the new VRF, and add an IP
address.
Answer: D
Avaya 6102-1 6102-1 test
NO.2 A Virtual Services Platform (VSP) 9000 chassis has the following connections:
Four 10GBaseER core connections in ports 3/4 , 3/8, 4/4, 4/8 (9024XL cards)
40 Copper 100BaseT connections for server aggregation (9048GT card)
How many Switch Fabric (SF) modules need to be installed in the roar of the chassis to
ensure that all of
the IO cards operate at full performance, even if a single SF modules fails (n + 1 SF
redundancy)?
A. Install three SFs in St modules 1, 2, 4.
B. Install four SFs in SF modules 1, 2, 3, 4.
C. Install five SFs in SF modules 1, 2, 3, 4, 5.
D. Install six SFs in SF modules 1, 2, 3, 4, 5, 6.
Answer: D
Avaya test 6102-1 exam dumps 6102-1 answers real questions 6102-1 questions
NO.3 A Split Multi Link Trunking (SMIT) for switch clustering is being configured.
Which statement is a configuration requirement for the SMIT?
A. The CP-Limit is configured on edge switch stacks.
B. VLANs that are defined on the SMLT are also defined on the tote IST.
C. Neighboring edge switch stacks should be connected to each other via the DMLT
connection to add
resilient paths in the event of an SMLT failure.
D. Alternate the primary path of the SMLT connection Lo load balance the switch core.
Answer: B
Avaya 6102-1 6102-1 demo 6102-1 6102-1 braindump
NO.4 A customer is mirroring multiple ports to a single monitor port.
What happens if the mirrored traffic exceeds the bandwidth of the monitor port?
A. The traffic will be buffered until there is available bandwidth.
B. The excess traffic will be dropped randomly.
C. The excess traffic will be dropped based upon the mirror priority of the ingress port.
D. The excess traffic will be dropped based upon the port priority of the ingress port.
Answer: B
Avaya 6102-1 6102-1 exam simulations 6102-1
NO.5 Which two management ports are available on the CP module? (Choose two.)
A. Serial interface
B. USB (host) interface
C. Ethernet interface
D. Modem interface
Answer: A,D
Avaya 6102-1 6102-1
NO.6 Internet Group Management Protocol (IGMP) is used by the IP Multicast router, to
learn about the
existence of host group members on their directly attached subnets.
Which statement about IGMP is true?
A. The IP Multicast routers get this information by listening for IP hosts broadcasting IGMP
queries and
reporting their host group memberships.
B. The IP Multicast routers get this information by broadcasting IGMP queries and listening
for IP hosts
reporting their host group memberships.
C. The IP Multicast routers get this information by recognizing the modified MAC address of a
Multicast
packet and adding that MAC address to the Multicast tree.
D. The IP Multicast routers get this information by listening for Multicast Servers broadcasting
IGMP
queries and listening for IP hosts reporting their host group memberships.
Answer: B
Avaya test answers 6102-1 test 6102-1
NO.7 Which types of packets will port mirroring not capture.?
A. Packets that are dropped on the ingress MAC
B. Packets that are destined for the standby CP
C. Packets that are properly forwarded through the VSP
D. Packets that have a destination address of 255.255.255.255
Answer: A
Avaya 6102-1 exam dumps 6102-1 6102-1
NO.8 Which command can be used to determine the management IPv6 address on the
Virtual Services
Platform (VSP) O000?
A. Show interfaces mgmtEthernet 1/1
B. Show ip interface vrf mgmtRouter
C. Show ipv6 interface vrf mgmtRouter
D. Show ipv6 address interface
Answer: D
Avaya exam prep 6102-1 exam simulations 6102-1
NO.9 Given the following ACL applied to an interface:
filter acl ace 1 5 name "xxxx" filter acl ace action 1 5 deny
filter acl ace ip 1 5 ip-protocol-type eq tcp
filter acl ace protocol 1 5 dst-port eq 23
filter acl ace 1 5 enable
What is the result of this filter?
A. permit telnet traffic
B. deny ftp traffic
C. permit only tcp traffic
D. deny telnet traffic
E. deny only tcp traffic
Answer: D
Avaya pdf 6102-1 6102-1 certification
NO.10 Avaya recommends that the Switch Fabric (SF) modules be installed in both Slot SF1
and Slot SF4.
What is the reason behind this recommendation?
A. It provides optimal load balancing between the SF modules.
B. It provides redundancy tor the bandwidth management.
C. It takes full advantage of the orthogonal midplane architecture.
D. It provides redundancy in case of a power supply failure.
E. It provides lossless SF failover.
Answer: B
Avaya exam prep 6102-1 test 6102-1 6102-1
ITCertKing offer the latest 74-353 exam material and high-quality HH0-380 pdf questions & answers. Our 70-688 VCE testing engine and 000-959 study guide can help you pass the real exam. High-quality HP2-B105 dumps training materials can 100% guarantee you pass the exam faster and easier. Pass the exam to obtain certification is so simple.
Article Link: http://www.itcertking.com/6102-1_exam.html
没有评论:
发表评论